Search

To Support Sentinel in F.E. Warren Missile Fields, USAF May Build 1,600 to 2,000 Miles of Utility Corridors

To Support Sentinel in F.E. Warren Missile Fields, USAF May Build 1,600 to 2,000 Miles of Utility Corridors
Pictured is the reentry of an unarmed Minuteman III ICBM during an August test in the Pacific (U.S. Air Force Photo)

The U.S. Air Force may need to fund 1,600 to 2,000 miles of utility corridors in 2026 through 2029 to support the Northrop Grumman [NOC] LGM-35A Sentinel in the missile fields attached to F.E. Warren AFB, Wyo. "The Air Force Nuclear Weapons Center anticipates a potential requirement for military construction (MILCON) of a Sentinel Utility Corridor at FEW AFB missile fields located within Wyoming, Colorado, and Nebraska," the center said in a Friday business notice. "This is a mission-critical effort…

Subscriber-only content. Please log in below.

Not a subscriber or registered user yet?

Please contact us at clientservices@accessintel.com or call us at 888-707-5814 (Monday – Thursday 9:00 a.m. – 5:30 p.m. and Friday 9:00 a.m. – 3:00 p.m. ET.), to start a free trial, get pricing information, order a reprint, or post an article link on your website.



Contract Updates

Hartech Group LLC (New Port Richey, Florida) – $10,153,033

Hartech Group LLC, New Port Richey, Florida, has been awarded a maximum $10,153,033 firm-fixed-price contract for three high precision jig grinders with Fanuc controllers. This was a sole-source acquisition using justification 10 U.S. Code 3204 (c)(1), as stated in Federal…


Lockheed Martin Space (Sunnyvale, California) – $142,621,543

Lockheed Martin Space, Sunnyvale, California, is being awarded a $142,621,543 noncompetitive, cost-plus-incentive-fee, cost-plus-fixed-fee, and firm-fixed-price contract modification (P00073) under a Foreign Military Sales (FMS) case to the United Arab Emirates (UAE). The total value of the contract increased to $876,747,896.…


Amentum Services (Chantilly, Virginia) – $10,645,952

Amentum Services, Chantilly, Virginia, was awarded a $10,645,952 cost-no-fee, time-and-materials modification (P00074) to contract W58RGZ-25-C-0004 to provide global aviation maintenance services. The modification brings the total cumulative face value of the contract to $158,855,989. Work will be performed in Schofield…


General Electric Co. (Lynn, Massachusetts) – $26,950,000

General Electric Co., Lynn, Massachusetts, was awarded a $26,950,000 cost-plus-incentive-fee modification (P00100) to contract W58RGZ-19-C-0003 to support the engineering and manufacturing development of the improved turbine engine. The modification brings the total cumulative face value of the contract to $862,954,255.…