Search

NASA Coverage for Next Space Station Crew Launch, Docking

NASA Coverage for Next Space Station Crew Launch, Docking

PR Newswire

WASHINGTON, March 7, 2019 /PRNewswire/ — Two American astronauts and a Russian cosmonaut are set to join the crew aboard the International Space Station on Thursday, March 14. The trio’s arrival will return the orbiting laboratory’s population to six, including three NASA astronauts. This launch will also mark the fourth Expedition crew with two female astronauts. Live coverage will air on NASA Television and the agency’s website.

NASA Logo. (PRNewsFoto/NASA) (PRNewsFoto/)

NASA astronauts Nick Hague and Christina Koch, and cosmonaut Alexey Ovchinin of Roscosmos, are set to launch aboard the Soyuz MS-12 spacecraft at 3:14 p.m. EDT (12:14 a.m. March 15 Kazakhstan time) from the Baikonur Cosmodrome in Kazakhstan on a six-hour journey to the station.  

The new crew members will dock to the Rassvet module at 9:07 p.m. Expedition 59 will begin officially at the time of docking.

About two hours later, hatches between the Soyuz and the station will open and the new residents will be greeted by NASA astronaut Anne McClain, station commander Oleg Kononenko of Roscosmos, and David Saint-Jacques of the Canadian Space Agency. The current three-person crew just welcomed the first American commercial crew vehicle as it docked to the station on March 3, amidst a busy schedule of scientific research and operations since arriving in December.

Coverage of the Expedition 59 crew’s launch and docking activities are as follows (all times EDT):

Thursday, March 14:

  • 2 p.m. – Soyuz MS-12 launch coverage (launch at 3:14 p.m.)
  • 8:45 p.m. – Docking coverage (docking scheduled for 9:07 p.m.)
  • 10:30 p.m. – Hatch opening and welcome coverage

A full complement of video of the crew’s pre-launch activities in Baikonur will air on NASA TV in the days preceding launch.

The crew members of Expeditions 59 and 60 will continue work on hundreds of experiments in biology, biotechnology, physical science and Earth science aboard the humanity’s only permanently occupied microgravity laboratory.

McClain, Saint-Jacques, Hague and Koch also are all scheduled for the first spacewalks of their careers to continue upgrades to the orbital laboratory. McClain and Hague are scheduled to begin work to upgrade the power system March 22, and McClain and Koch will complete the upgrades to two station power channels during a March 29 spacewalk. This will be the first-ever spacewalk with all-female spacewalkers. Hague and Saint-Jacques will install hardware for a future science platform during an April 8 spacewalk.

Hague and Ovchinin are completing a journey that was cut short Oct. 11, when a booster separation problem with their Soyuz rocket’s first stage triggered a launch abort two minutes into the flight. They landed safely a few minutes later, after reaching the fringes of space, and were reassigned to fly again after McClain, Kononenko and Saint-Jacques launched in early December. This will be Ovchinin’s third flight into space, the second for Hague and the first for Koch. Hague, Koch, and McClain are from NASA’s 2013 astronaut class, half of which were women—the highest percentage of female astronaut candidates ever selected for a class.

Check out the full NASA TV schedule and video streaming information at:

http://www.nasa.gov/nasatv

Keep up with the International Space Station, and its research and crews, at:

http://www.nasa.gov/station

Get breaking news, images and features from the station on Instagram and Twitter at:

http://instagram.com/iss

and

http://www.twitter.com/Space_Station

 

Cision View original content to download multimedia:http://www.prnewswire.com/news-releases/nasa-coverage-for-next-space-station-crew-launch-docking-300808909.html

SOURCE NASA



Contract Updates

R&M Government Services (Las Cruces, New Mexico) – $23,894,784

R&M Government Services,* Las Cruces, New Mexico, has been awarded a maximum $23,894,784 firm-fixed-price, indefinite-quantity contract for battery compartments. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in the Federal Acquisition Regulation 6.302-1. This…


L3Harris Technologies Inc. (Clifton, New Jersey) – $9,571,947

L3Harris Technologies Inc., Clifton, New Jersey, is being awarded $9,571,947 for a firm-fixed-price contract for the procurement of 74 radio frequency amplifiers in support of Navy F/A-18E/F/G aircraft. The contract does not include an option provision. All work will be…


Sikorsky Aircraft Corp. a Lockheed Martin Co. (Stratford, Connecticut) – $21,600,000

Sikorsky Aircraft Corp., a Lockheed Martin Co., Stratford, Connecticut, is awarded a not-to-exceed $21,600,000 cost reimbursable undefinitized order (N0001926F1016) against a previously issued basic ordering agreement (N0001923G0002). This order provides for instantaneous access to 105% Transient Engine Torque test and…


Amentum Mitie Pacific LLC (Chantilly, Virginia) – $85,236,794

Amentum Mitie Pacific LLC, Chantilly, Virginia, is awarded an $85,236,794 fixed-price-award-fee, indefinite-delivery/indefinite-quantity contract for base operating support services at Navy Support Facility, Diego Garcia. Work will be performed at Diego Garcia, British Indian Ocean Territory, and is expected to be…