The Army wants responses and comments by April 30 to its draft Request for Proposals (RFP) for Joint Air-to-Ground Missile (JAGM) engineering and manufacturing development and low-rate initial production. The next-generation missile will be carried on rotary-wing, fixed-wing and unmanned aerial system (UAS) platforms, with an expected initial operational capability in 2016. The missiles are expected to replace Hellfire II, Longbow Hellfire and Maverick missiles. The government anticipates "a limited competition and restricted to the current JAGM System Technology Demonstration…
Recommended
Navy, Marine Corps Experimenting With Large Scale Advanced Manufacturing Network During RIMPAC
Trending
Congress Updates
CBO Says Upfront Costs To Protect Military Installations From Drones Between $1 Million And $74 Million
The initial costs to acquire and deploy counter-small unmanned aircraft system (C-sUAS) defenses at individual Defense Department installations are estimated at between $1.2 million and $73.6 million depending on the […]
House Heads For Recess Without Moving On NDAA After Procedural Vote Fails
The House will leave for the Fourth of July recess without moving forward on its $1.15 trillion fiscal year 2027 National Defense Authorization Act (NDAA), with a procedural vote to […]
Bipartisan Group Of House Members Introduce U.S.-Ukrainian Co-Production Bill For Unmanned Systems
A bipartisan group of six House legislators have introduced the Strategic Unmanned Systems Partnership Act–a bill to improve drone collaboration between the U.S. and Ukraine. Rep. Michael McCaul (R-Texas), the […]
Will $4 Billion For SB-AMTI/Space Data Network Backbone In Supplemental Reduce Or Add To Planned Funding For Systems In Reconciliation?
Nearly all of the Department of the Air Force’s fiscal 2027 procurement and research and development (R&D) budget for space-based air moving target indication (SB-AMTI) and the Space Data Network […]