Search

SpaceX Aims To Begin Flight Tests Of New Mars Rocket In First Half Of 2019, Musk Says

The Big Falcon Rocket (BFR), which SpaceX is developing to colonize Mars, is on a path to begin flight tests in the first half of 2019, according to company founder Elon Musk.Initial tests will probably be short up-and-down flights, Musk said March 11 at the South by Southwest Conference in Austin, Texas.Musk acknowledged that the test schedule could change.“I’m feeling pretty optimistic about the timeline, although … people have told me that my timelines historically have been optimistic,” Musk said. “So I’m trying…

Subscriber-only content. Please log in below.

Not a subscriber or registered user yet?

Please contact us at clientservices@accessintel.com or call us at 888-707-5814 (Monday – Thursday 9:00 a.m. – 5:30 p.m. and Friday 9:00 a.m. – 3:00 p.m. ET.), to start a free trial, get pricing information, order a reprint, or post an article link on your website.



Contract Updates

Hartech Group LLC (New Port Richey, Florida) – $10,153,033

Hartech Group LLC, New Port Richey, Florida, has been awarded a maximum $10,153,033 firm-fixed-price contract for three high precision jig grinders with Fanuc controllers. This was a sole-source acquisition using justification 10 U.S. Code 3204 (c)(1), as stated in Federal…


Lockheed Martin Space (Sunnyvale, California) – $142,621,543

Lockheed Martin Space, Sunnyvale, California, is being awarded a $142,621,543 noncompetitive, cost-plus-incentive-fee, cost-plus-fixed-fee, and firm-fixed-price contract modification (P00073) under a Foreign Military Sales (FMS) case to the United Arab Emirates (UAE). The total value of the contract increased to $876,747,896.…


Amentum Services (Chantilly, Virginia) – $10,645,952

Amentum Services, Chantilly, Virginia, was awarded a $10,645,952 cost-no-fee, time-and-materials modification (P00074) to contract W58RGZ-25-C-0004 to provide global aviation maintenance services. The modification brings the total cumulative face value of the contract to $158,855,989. Work will be performed in Schofield…


General Electric Co. (Lynn, Massachusetts) – $26,950,000

General Electric Co., Lynn, Massachusetts, was awarded a $26,950,000 cost-plus-incentive-fee modification (P00100) to contract W58RGZ-19-C-0003 to support the engineering and manufacturing development of the improved turbine engine. The modification brings the total cumulative face value of the contract to $862,954,255.…