Search

Impossible Aerospace Claims Electric Aviation First

Impossible Aerospace Claims Electric Aviation First

Electric US-1 Crosses Black Rock Desert on a Single Battery Charge

PR Newswire

SANTA CLARA, Calif., Aug. 20, 2019 /PRNewswire/ — Impossible Aerospace announced that its US-1 “flying battery” quadcopter became the first aircraft of its kind to cross the northern Nevada desert without recharging in repeated 72-minute flights across the playa on August 6, 2019.

The Impossible Aerospace US-1 demonstrated its battery superiority in an all-electric crossing of the Black Rock Desert on August 6, 2019.

This flight marked yet another public demonstration for the US-1, first unveiled at Interdrone 2018. The aircraft used for the flight was an unmodified production US-1, carrying with it both a FLIR Duo Pro R camera and HD video transmitter. With and against the prevailing winds, the US-1 flew distances of 29 and 21 miles respectively.

“The US-1 is the first major breakthrough in drone performance since the introduction of the quadcopter,” said Spencer Gore, CEO. “More importantly, is the first battery-electric aircraft to rival the performance of a conventionally powered system.”

While many electric aircraft have flown similar distances, the US-1 differs in that it uses propellers instead of wings to fight gravity, which requires more energy per mile but allows the aircraft to hover in place.

The US-1 has seen strong commercial traction with government and enterprise customers. On August 5th, the city of San Pablo, California announced it would be purchasing three US-1 aircraft for use by its police department, and on August 13, gas detection company SeekOps announced it would integrate with US-1.

According to the company, the flight was planned to avoid operations over people and protected wilderness areas. The flight was conducted under 14 CFR 107.25, with the pilot operating as a passenger of a moving vehicle over a sparsely populated area maintaining visual line of sight to the aircraft.

“The ultimate vision of Impossible Aerospace is to build long-range electric aircraft that carry goods and people around the world, emissions free,” said Gore. “But electrification changes literally everything about an aircraft, and many of these changes will take years to prove safe enough for passenger transport. In the meantime, we believe it’s prudent to push the envelope of electric aircraft using unmanned aircraft, and to advance drone regulations by piloting use cases that save lives.”

Impossible Aerospace designs, engineers, assembles and services the US-1 from its Santa Clara, California factory. The US-1 is available for order online at https://impossible.aero

 

The US-1 crossed the Black Rock Desert using a mission profile that avoided restricted wilderness areas and preparations for the annual Burning Man celebration.

Cision View original content to download multimedia:http://www.prnewswire.com/news-releases/impossible-aerospace-claims-electric-aviation-first-300903898.html

SOURCE Impossible Aerospace



Congress Updates

CBO Says Upfront Costs To Protect Military Installations From Drones Between $1 Million And $74 Million

The initial costs to acquire and deploy counter-small unmanned aircraft system (C-sUAS) defenses at individual Defense Department installations are estimated at between $1.2 million and $73.6 million depending on the […]


House Heads For Recess Without Moving On NDAA After Procedural Vote Fails

The House will leave for the Fourth of July recess without moving forward on its $1.15 trillion fiscal year 2027 National Defense Authorization Act (NDAA), with a procedural vote to […]


Bipartisan Group Of House Members Introduce U.S.-Ukrainian Co-Production Bill For Unmanned Systems

A bipartisan group of six House legislators have introduced the Strategic Unmanned Systems Partnership Act–a bill to improve drone collaboration between the U.S. and Ukraine. Rep. Michael McCaul (R-Texas), the […]


Will $4 Billion For SB-AMTI/Space Data Network Backbone In Supplemental Reduce Or Add To Planned Funding For Systems In Reconciliation?

Nearly all of the Department of the Air Force’s fiscal 2027 procurement and research and development (R&D) budget for space-based air moving target indication (SB-AMTI) and the Space Data Network […]