Search

Amid Uncertainty On ITEP’s Future, Black Hawk Hovers For First Time With New Engine

Amid Uncertainty On ITEP’s Future, Black Hawk Hovers For First Time With New Engine
Sikorsky receives the first two GE Aerospace T901 engines at its West Palm Beach, Florida facility for integration on a UH-60M Black Hawk helicopter. Photo: Sikorsky.

NASHVILLE, Tenn. – While the status of Army’s program to develop a future helicopter engine remains uncertain, a lead official confirmed a UH-60 Black Hawk helicopter integrated with the new GE Aerospace [GE] T901 engine lifted off the ground for the first time this week.  “This week, the [Black Hawk] aircraft was ready to fly and we were able to come to a hover with the aircraft,” Brig. Gen. David Phillips, program executive officer for aviation, said during a briefing here…

Subscriber-only content. Please log in below.

Not a subscriber or registered user yet?

Please contact us at clientservices@accessintel.com or call us at 888-707-5814 (Monday – Thursday 9:00 a.m. – 5:30 p.m. and Friday 9:00 a.m. – 3:00 p.m. ET.), to start a free trial, get pricing information, order a reprint, or post an article link on your website.



Contract Updates

BAE Systems Space & Mission Systems Inc. (Boulder, Colorado) – $48,000,000

BAE Systems Space & Mission Systems Inc., Boulder, Colorado, was awarded a $48,000,000 firm-fixed-price contract for the study, design, development, enhancement, testing, and procurement of advanced communication-electronics technologies. Bids were solicited via the internet with one received. Work locations and…


Portus Stevedoring LLC (Jacksonville, Florida) – $8,292,583

Portus Stevedoring LLC, Jacksonville, Florida, is awarded a not-to-exceed $8,292,583 firm-fixed-price, indefinite-delivery/indefinite-quantity contract with a five-year ordering period for stevedoring and related terminal services. This contract provides for full range of stevedoring and related terminal services to include the receipt,…


Foster Miller doing business as QinetiQ North America (Waltham, Massachusetts) – $11,310,230

Foster Miller, doing business as QinetiQ North America, Waltham, Massachusetts, is awarded an $11,310,230 firm-fixed-price modification to a previously awarded indefinite-delivery/indefinite-quantity contract (N00174-21-D-0019) to exercise Option Year Four for production, engineering support, and post-production support of the MK 2 Man…


EnergySolutions Services Inc. (Oak Ridge, Tennessee) – $13,336,650

EnergySolutions Services Inc., Oak Ridge, Tennessee, is being awarded a $13,336,650 firm-fixed-price, indefinite-delivery/indefinite-quantity contract action (N42158-25-D-E001) for nuclear services for the processing, recycling and disposal of radiologic materials through disassembly, decontamination, metal melting, compaction, incineration, resin sluicing/dewater, bulk waste assay…