Kiewit Infrastructure West Co., Honolulu, Hawaii, is awarded a $64,993,500 firm-fixed-price contract for P-704 Sewer Lift Station and Relief Sewer Lines, Joint Base Pearl Harbor-Hickam, Hawaii. The work to be performed provides for two major components. The first component is a new wastewater pump station to replace existing pump station SY-001. The second component is a new gravity sewer main along South Avenue that replaces an existing gravity trunk sewer. A new pump station and gravity sewer line are required to accommodate the anticipated increase in wastewater flows from proposed shore activities within the existing pump station SY-001 collection area and to accommodate peak wet-weather flows with the required level of redundancy. Work will be performed in Oahu, Hawaii, and is expected to be completed by June 2021. Fiscal 2017 military construction (Navy) contract funds in the amount of $64,993,500 are obligated on this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website, with five proposals received. The Naval Facilities Engineering Command, Hawaii, Joint Base Pearl Harbor-Hickam, Hawaii, is the contracting activity (N62478-19-C-1515).