The success of the Army’s revolutionary new rotorcraft will depend on open architecture software standards that can be rapidly reconfigured as much if not more than on the aircraft design, according to industry and government officials leading the Future Vertical Lift (FVL) effort.FVL will eventually result in a family of futuristic helicopters with a baseline design that is then scaled to perform attack, utility and heavy-lift missions. Before that program of record gets underway, the ongoing Joint Multi-Role Technology Demonstration…
Recommended
Trending
Congress Updates
Guetlein On Golden Dome: ‘We Cannot Protect This Nation And Bankrupt It At The Same Time’
While there has been criticism among missile defense advocates of Golden Dome’s development pace after the signing of an executive order in January last year, Space Force Gen. Michael Guetlein, […]
Interview with Rep. Jeff Crank (R-Colo.), co-chair of the Golden Dome Caucus
Rep. Jeff Crank (R-Colo.), a co-chair of the Golden Dome Caucus in Congress and a member of the House Armed Services Committee’s strategic forces panel, discusses the transformative defense investments […]
Space Force PAE For Infrastructure Completing Move To Colorado Springs
U.S. Space Force Space Systems Command’s (SSC) Portfolio Acquisition Executive (PAE) for infrastructure–a $4 billion contracting hub for SSC–is completing a move from Los Angeles Air Force Base, Calif. to […]
Wisconsin GOP Lawmakers Urge Trump Admin Support For Marines’ JLTV Second Supplier Effort
Wisconsin’s GOP congressional delegation is urging the Trump administration to support legislative language enabling the Marine Corps to potentially bring in a second Joint Light Tactical Vehicle (JLTV) supplier. The […]
Job Feed
-
Senior/Principal Radar Signal Processing Engineer (SAR Focus), Onsite
Sandia National Laboratories - Albuquerque, NM -
Senior/Principal RF/Microwave Engineer
Advanced RF Applications, Onsite - Sandia National Laboratories - Albuquerque, NM -
Senior/Principal AI Researcher (CA), Onsite
Sandia National Laboratories - Livermore, CA -
Cleared Senior/Principal Project Lead, Space Systems
Onsite - Sandia National Laboratories - Albuquerque, NM
By