Search

Contract Award: Colt’s Manufacturing Company LLC (West Hartford, Connecticut) – $7,953,750

Colt’s Manufacturing Company LLC, West Hartford, Connecticut, has been awarded a maximum $7,953,750 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for bolt breech’s. This was a competitive acquisition with two responses received. This is a five-year contract with no option periods. Location of performance is Connecticut, with a Jan. 17, 2024, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2024 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-19-D-0001).



Contract Updates

Hartech Group LLC (New Port Richey, Florida) – $10,153,033

Hartech Group LLC, New Port Richey, Florida, has been awarded a maximum $10,153,033 firm-fixed-price contract for three high precision jig grinders with Fanuc controllers. This was a sole-source acquisition using justification 10 U.S. Code 3204 (c)(1), as stated in Federal…


Lockheed Martin Space (Sunnyvale, California) – $142,621,543

Lockheed Martin Space, Sunnyvale, California, is being awarded a $142,621,543 noncompetitive, cost-plus-incentive-fee, cost-plus-fixed-fee, and firm-fixed-price contract modification (P00073) under a Foreign Military Sales (FMS) case to the United Arab Emirates (UAE). The total value of the contract increased to $876,747,896.…


Amentum Services (Chantilly, Virginia) – $10,645,952

Amentum Services, Chantilly, Virginia, was awarded a $10,645,952 cost-no-fee, time-and-materials modification (P00074) to contract W58RGZ-25-C-0004 to provide global aviation maintenance services. The modification brings the total cumulative face value of the contract to $158,855,989. Work will be performed in Schofield…


General Electric Co. (Lynn, Massachusetts) – $26,950,000

General Electric Co., Lynn, Massachusetts, was awarded a $26,950,000 cost-plus-incentive-fee modification (P00100) to contract W58RGZ-19-C-0003 to support the engineering and manufacturing development of the improved turbine engine. The modification brings the total cumulative face value of the contract to $862,954,255.…