Search

Lockheed Martin Nabs $451 Million In More Long-Lead Work On Saudi Surface Combatants

Lockheed Martin Nabs $451 Million In More Long-Lead Work On Saudi Surface Combatants
A Multi Mission Combat Ship, based on the Freedom-variant Littoral Combat shi, with an MH-60R Seahawk helicopter. Lockheed has started working on four ships for Saudi Arabia. (Artist rendering: Lockheed Martin)

The Naval Sea Systems Command on Monday awarded Lockheed Martin [LMT] a $451 million modification for the long-lead-time and detail design to support building four Multi Mission Surface Combatant (MMSC) ships for a sale to Saudi Arabia.The MMSC is based on the Freedom-variant Littoral Combat Ship (LCS) hull, built at Fincantieri Marinette Marine in Wisconsin. Lockheed describes it as using that proven hull to meet international navies’ maritime needs.Previously the U.S. Navy awarded Lockheed Martin $481 million for long-lead-time material…

Subscriber-only content. Please log in below.

Not a subscriber or registered user yet?

Please contact us at clientservices@accessintel.com or call us at 888-707-5814 (Monday – Thursday 9:00 a.m. – 5:30 p.m. and Friday 9:00 a.m. – 3:00 p.m. ET.), to start a free trial, get pricing information, order a reprint, or post an article link on your website.



Congress Updates

House Republicans Block Measure To Impeach Hegseth

House Republicans on Tuesday evening voted to block an attempt to impeach Defense Secretary Pete Hegseth. In a 211-204 vote, the House moved to refer Rep. Thomas Massie’s (R-Ky.) articles […]


Top House Defense Appropriator Calvert Officially Wins Reelection Bid

Rep. Ken Calvert (R-Calif.), House Republicans’ top defense appropriator, has officially won his reelection bid.  Calvert was running for a redistricted seat against fellow House Republican Rep. Young Kim (R-Calif.), […]


No Path To Defense Reconciliation, Including GOP’s $350 Billion, Coons Says

Top Senate Democrats threw cold water on any GOP plans for a $350 billion fiscal 2027 reconciliation bill, or any defense reconciliation bill, before a new Congress is sworn in […]


Industry Groups ‘Urge’ Congress To Block Stock Buyback Restriction From Final FY ‘27 NDAA

More than three dozen industry associations on Monday called on congressional defense committee leaders to scrap a provision in the final version of the next National Defense Authorization Act that […]