B-1 Lancer
-
Air ForceUSAF Looks to Refurbish Engine Ducts on B-1Bs
U.S. Air Force Global Strike Command wants a contractor to help renovate the ducts on the Boeing [BA] B-1B bomber’s engine bleed air distribution system (EBADS). “Hydrogen embrittlement is common […]
-
Air ForceRise in Spare Parts Cost Cited As Major Factor Behind USAF Requested Increase in FY 2024 for Flying Hours
Gross Issue Effectiveness (GIE) and Supply Response Time (SRT) for the on-time delivery of required spare parts are to be key features of a Performance-Based Logistics contract that the F-35 […]
-
Air ForceU.S. Air Force Needs to Neck Down to Two Bomber Fleet “As Quickly As Possible”
Over the next decade, the U.S. Air Force wants to start necking down to a bomber force of two fleets–76 re-engined and upgraded Boeing [BA] B-52s and at least 100 […]
-
Air ForceB-1Bs Resume Flight After April Grounding for Fuel Leak
U.S. Air Force B-1B Lancer bombers by Boeing [BA] began a resumption of flights on May 3rd after a safety stand-down by Gen. Timothy Ray, the head of Air Force […]
-
Air ForceU.S. Air Force to Look Into Parts Obsolescence with B-1, B-2 Oxygen Systems
The U.S. Air Force plans to examine how to resolve parts obsolescence issues for the on-board oxygen generation systems (OBOGS) for the Boeing [BA] B-1B and Northrop Grumman [NOC] B-2 […]
-
Air ForceU.S. Air Force Releases Final Environmental Impact Statement for B-21 Locations
The U.S. Air Force has released a final 458-page Environmental Impact Statement (EIS) for two possible first bed down locations for the Northrop Grumman [NOC] B-21 Raider stealth bomber at […]
-
Air ForceAir Force Global Strike Command Briefs Congress on ‘North of 220’ Bomber Plan
The U.S. Air Force Global Strike Command (AFGSC) has briefed congressional defense authorizers on the Air Force bomber roadmap, which lays out a requirement for more than 220 in future […]
Tagged in: -
Air ForceAir Force Completes $1.27 Billion Upgrade for B-1B Fleet
The Air Force said on Sept. 24 that it has finished a $1.27 billion Integrated Battle Station (IBS) upgrade for its fleet of Boeing [BA] B-1B bombers–a program that began […]
-
Air ForceU.S. Air Force Goal for 220 Bombers Could Change
A U.S. Air Force goal for 220 bombers–75 re-engined Boeing [BA] B-52Hs and 145 Northrop Grumman [NOC] B-21 Raider stealth aircraft–could change, Air Force Global Strike Commander Gen. Timothy Ray […]
-
COVID-19Air Force Rapid Capabilities Office Moves to Reduce COVID-19 Supply Chain Impact
The U.S. Air Force Rapid Capabilities Office (RCO) has taken action to reduce the supply chain impact of COVID-19, including using workers at Wichita-based SpiritAerosystems, Inc. [SPR] who had been […]